THE PIPELINE WILL ENABLE BLOCK 5A TO PRODUCE THE MAXIMUM CAPACITY OF ITS PROCESSING FACILITY.
To unlock the full potential of Block 5A oilfields, a 350km tie-in pipeline has to be constructed from Block 5A, Tharjiath to Block 3D, 3E and 7E in Paloch.
The pipeline route was selected as the least costly and most robust.
Tharjiath-Palouch Crude Oil Pipeline Ltd is a company registered in the British Virgin Island to function as a Special Purpose Vehicle (SPV) or Project Company for the Construction of the Tharjiath-Palouch Crude Oil Pipeline on a Public-Private Partnership (PPP) using a Build-Own-Operate-Transfer (BOOT) model.
Download the TPCOP Brochure and find out more about the Tharjiath-Palouch Crude Oil Pipeline project
Key Figures
The construction of the project will provide over 3000 jobs directly and with the implementation of local content engagement, South Sudanese owned companies will be subcontracted to perform part of the work scopes such as civil works, supply of locally sourced materials and labor.
350KM
Crude Oil Pipeline
80kbd
Peak Production from Block 5A
USD 15-20 Billion
Revenue for RSS between 2025-2040
USD 500M – 700M
Investment in Project
2900%
Increase in Foreign Direct Investment in RSS